Completed Rear Elevation
Completed Front Elevation
Steels in Main Loft
Steels in main loft
New floor in main loft
Ashla wall in main loft
View from rear box into main loft
New loft ceiling structure
Steels in the back box
Chimney breast in back box that had to be removed
View from main loft looking over the back box
New floor in back box
New wall between the neighbours and back of the loft conversion
New stud work for both main loft and back box
Stud work for both front back and back box
Looking from the outside back into the stud structure of both the main box and back box of the loft conversion
Felt and batten of the back box for the new roof
Felt and batten of the new front roof.
Begining the tiling of the front roof
Completed front roof
Tiling of the rear box
Completed tiling of the rear elevation of the loft conversion
Code four led gulley.
Fibre glass roof
Plastered hallway and sky light
Ensuite off Master Bedroom
Ensuite of Master Bedroom
Seperate Toilet in the back box
Plaster boarded areas
Finished and painted halway
Master Bedroom and front Velux
Back Box
Master Bedroom
Looking down from the top of the Loft Conversion
Looking down from the top of teh loft conversion
Room in the back Box
Room in the back box
Door way into the Back box
Back room
Architectural Radiator in Master Bedroom
Finished front elevation